APS executed the replacement of a vertical inline fire pump manufactured by Patterson at Stanford Hospital. The scope included full labor, materials, equipment, permitting, and supervision. The project involved installation of a new fire pump, pump motor, jockey pump, controller, and automatic transfer switch (ATS), all tested to meet manufacturer and industry standards. APS coordinated with A/E teams to follow structural and anchorage specifications and developed detailed MOPs for fire alarm, electrical, and emergency systems including the hospital’s generator. A temporary fire protection system was deployed to maintain safety during installation. The project was completed ahead of schedule and within budget, ensuring full compliance and operational readiness.
Let’s discuss how our construction expertise can support your project’s specific requirements.
American Project Solutions (APS) is a Veteran Owned and Operated Consulting and Construction firm. We are committed to outstanding project management and delivery regardless of the scale or the intricacy of the work.
CA California License: #1111863 |
General Building – B
©2025 by American Project Solutions.
Website Disclaimer | Cookie Policy | SMS Privacy Policy | Privacy Policy