Cash Flow Management
Without structured cash flow and cost flow planning, projects risk funding gaps, inaccurate forecasts, and reactive financial decisions.
Resource Allocation Planning
Without realistic resource allocation and productivity tracking, cost and schedule forecasts are built on assumptions rather than measurable performance.
Critical Path Method Scheduling
A CPM schedule translates scope and strategy into a logical, time-based plan—without it, schedule control becomes reactive and unreliable.
Bill of Quantities
A reliable BOQ provides the quantitative foundation required for accurate costing, forecasting, and change management in project controls.
Work Breakdown Structure
A properly structured WBS enables accurate cost tracking, schedule control, and reporting—without it, project controls cannot function reliably.